DEMOLITION AND REPAIR
In 1972, the patio between the house and detached garage was enclosed without permit.
In 2021, LADBS refused to permit the construction unless it was torn down and reconstructed. The section was demolished.
The tenants chose to remain during the construction and all city obligations were satisfied in less than 2 months.
- Photo of construction in 1972
- Exterior view of the constructed room 40 years later
- Interior view of the constructed room 40 years later
- Demolition completed in a day and a half
- One side required a new exterior wall and a section of roof
- A new sliding glass window was installed before the stucco was replaced
- The new wall was wired and added before the roof was repaired
- New stucco was added and eaves repaired
- New wall and stucco was added and missing roof and eaves were replaced
- Finished walls matched the rest of house perfectly